Do you need to define the true position and elevation of your project?

The most flexible way is through linked files and Shared Positioning. This requires at least two files; a site file and a building project or perhaps several building project files if applicable.

Here is a screen recording of how to relocate an elevation (z height) in Revit Architecture 2010.